Tools, lighting, site cabins: site power without a generator set.

Construction sites
Illustration: not a contractual representation.

The need, the answer

A 2,200 W core drill, a 1,800 W saw, four LED floodlights and the site manager's cabin: that is a typical day, and it is what an NV-W50 with an NV-B5 battery powers without fuel.

The 32 A industrial socket takes heavy tools directly. The 30 mA RCD and the circuit breaker on each socket protect people and equipment without an additional site distribution board.

The station recharges overnight from the site cabin's mains supply, or during the day from NV-S240 panels laid on the container. On a site with no grid, NV-B5 batteries extend the runtime to several days.

Worked example

Typical day: 4 LED floodlights (200 W, 8 h), the office (400 W, 8 h) and a rotary hammer (1,600 W, 1 h 30 in total), giving 7.2 kWh, covered by an NV-W50 with one NV-B5 battery.

Runtimes calculated on 85% of rated capacity.