Illustration: not a contractual representation.
NV-M mobile storage, on skid
NV-M500, The 250 kW
The replacement for the 200 kVA generator set, with fast charger
- 450 kWhusable kWh
- 250 kWAC continuous, 400 V
- 320 kWmachine charging
- ≤ 6 tweight
On quotation, contact us for availability
What for
- A 25 t excavator (450 kWh usable) charged in under 3 h, or two mid-size machines at once.
- Large sites and industry: 250 kW continuous, 396 A per phase.
- Hybrid mode: the generator set runs two hours at full load instead of ten at idle.
- Backup for a building or a process: 250 kW for nearly two hours, seamless switchover.
How long it lasts
| Load | Average power | Runtime per charge |
|---|---|---|
| Cabins for 20 people, electric heating | 15 kW | 30 h 00 |
| Tower crane + site lighting | 30 kW | 15 h 00 |
| Four MIG 400 A sets (40% duty cycle) | 40 kW | 11 h 15 |
| 6 MIG 500 A + TIG 400 A sets | 70 kW | 6 h 26 |
| 90 kW concrete pump | 90 kW | 5 h 00 |
| 2,000 m² office building on backup | 120 kW | 3 h 45 |
| Site batching plant | 200 kW | 2 h 15 |
Energy delivered = capacity × 90%. Runtimes calculated on 90% of rated capacity, not measured. Average power over the shift: a 500 A welding set draws 25 kW while arcing, almost nothing between two beads. The peak (motor start) must stay below rated power: no overload. “no”: above the rated AC power.
Specifications
NV-M500
| Capacity | 500 kWh |
|---|---|
| Energy delivered per charge | 450 kWh |
| Continuous AC power | 250 kW, 400 V |
| Max. AC current | 396 A |
| Machine charging (DC) | 320 kW |
| Guns | 2 CCS2 guns of 160 kW |
| Charging the unit | 43 kW (63 A) or 70 kW (100 A), input ≤ 200 A |
| AC inputs and outputs | Powerlock 400 A; CEE 125 / 63 / 32 / 16 A |
| Format | Forklift skid, 4 lifting eyes; trailer version possible |
| Weight | ≤ 6 t |
| Dimensions L × W × H | 3 205 × 1 740 × 2 117 mm |
| Altitude | ≤ 2,000 m |
Common to the whole range
| Cells | Latest-generation LiFePO4, identical modules; non-recoverable energy below 10% |
|---|---|
| Cooling | Battery liquid-cooled in a closed circuit, ventilated electrical section |
| Grid | 230 / 400 V three-phase 4-wire, 50 / 60 Hz, islanded mode; switchover < 20 ms on backup |
| DC charger | CCS2, 200 to 1,000 V DC, 2 to 250 A per gun; MCS on the large models |
| Overload | None: size on the site's peak power |
| Environment | IP54, C4 anticorrosion, −30 to +50 °C, ≤ 95% RH |
| Safety | Automatic fire suppression (aerosol; clean agent gas on the 20-foot), emergency stop, insulation monitoring |
| Service life | ≥ 6,000 cycles; battery warranty 6 years or 6,000 cycles, converter 3 years |
| Supervision | Touch screen in English and French, remote control from a computer or a phone |
| Transport | UN 3536 class 9; CE, UN 38.3 and IEC 62619 reports supplied with the order |
Energy delivered = capacity × 90%. Runtimes calculated on 90% of rated capacity, not measured.
How many fills
Machine fills from 20 to 100% per full charge of the unit, for the reference machines.
| Machine | Battery | Fills per charge |
|---|---|---|
| Develon DX85RE-7 | 235 kWh | 2.3 |
| Volvo EWR150 Electric | 270 kWh | 2.0 |
| Develon DX160WE-7K | 380 kWh | 1.4 |
| Develon DX230LCE-7 | 435 kWh | 1.2 |
| Volvo A30 Electric | 450 kWh | 1.2 |
| Develon DX250LCE-7 | 570 kWh | 0.9 |
| Volvo A40 Electric | 540 kWh | 1.0 |
| Volvo L120 Electric | 282 kWh | 1.9 |
Fill = 80% of the machine's battery, 95% charging efficiency. Battery capacities published by the manufacturers, to be checked against your machine's data sheet. The brands mentioned belong to their respective owners. NV Power Station has no commercial relationship with these manufacturers; their machines are cited as sizing references.
Charging the unit
From 0 to 100%, on the site supply or with a generator set in hybrid mode.
| Source | Power | Time |
|---|---|---|
| 63 A supply | 43 kW | 11 h 38 |
| 100 A supply | 70 kW | 7 h 09 |
| 250 A supply | 70 kW (limited by the unit) | 7 h 09 |
| 400 A supply | 70 kW (limited by the unit) | 7 h 09 |
| 500 kVA generator set in hybrid mode | 70 kW (limited by the unit) | 7 h 09 |
Time = capacity ÷ charging power, capped by the unit's AC input (70 kW).
In pictures



The other models

NV-M250
The 125 kW. For one machine or a small site, on skid
- usable kWh
- 225 kWh
- AC continuous
- 125 kW
- Machine charging
- 160 kW
- Weight
- ≤ 3 t

NV-C1000
The 1 MWh. 10-foot container, carried by hook-lift truck
- usable kWh
- 900 kWh
- AC continuous
- 500 kW
- Machine charging
- 800 kW
- Weight
- ≤ 11.2 t

NV-C1300
The 1.3 MWh. 10-foot container, 625 kW and five guns
- usable kWh
- 1,170 kWh
- AC continuous
- 625 kW
- Machine charging
- 800 kW
- Weight
- ≤ 15.3 t

NV-C3000
The 3 MWh. 20-foot container, ten guns, 2 MW of charging
- usable kWh
- 2,700 kWh
- AC continuous
- 500 kW
- Machine charging
- 2,000 kW
- Weight
- ≤ 30.5 t

NV-C4000
The 4 MWh. Pure DC charging station, 2 × 1,000 kW MCS
- usable kWh
- 3,600 kWh
- AC continuous
- none
- Machine charging
- 2,000 kW
- Weight
- ≤ 36.5 t
Illustration: not a contractual representation.
NV-C3000, NV-C4000: Photo taken at the plant, pre-series unit; delivered units carry the NV Power Station livery.
Your NV-M500, on quotation
Tell us the site's average power and peak, the operating hours, your machines and the supply available: we confirm the model and send you an offer.
Request a quote